Things are moving on in San Stefanos. 90 square metres of metals for the 'box' have been laid and the concrete poured.



There was a small problem when a concrete lorry broke down which meant the light was fading somewhat, when the concrete was finally poured. Fortunately the end result looks pretty smooth (well, from the photographs it looks OK, at least)
Now it's time to stop for a few weeks - it's Christmas!! See you in 2009.
No comments:
Post a Comment